Going solar, minus the hassle
Most homeowners go from first click to power-on in 4–8 weeks — and spend less than two hours of their own time on the entire process. Here's exactly what happens.
Instant estimate & consultation
Day 1Run our 60-second estimator or call us. A solar advisor reviews your utility bill and pulls satellite imagery of your roof to verify sun exposure, shading, and usable area. You get real numbers — system size, price after incentives, projected savings — with zero obligation.
Custom design & agreement
Week 1–2Our engineers produce a panel-by-panel layout with a production forecast for your exact roof. You see transparent line-item pricing and financing options ($0-down available). Nothing proceeds until you're completely comfortable.
Permits & paperwork — all handled
Week 2–5We file your city permits, HOA application if needed, utility interconnection request, and incentive paperwork. This is the longest phase and it requires nothing from you — we chase every signature.
Installation day
Usually 1 dayOur in-house crew arrives in the morning; most homes are done by evening. Mounting, panels, inverter, battery if you chose one, and a clean job site when we leave. Your roof warranty stays protected with flashed, sealed penetrations.
Inspection & power-on
Week 5–8The city inspects, the utility grants Permission to Operate (PTO), and we flip the switch together. Your monitoring app goes live and your next bill starts shrinking. We stay with you for 25+ years of warranty coverage.
Your total time investment: one phone consultation, one design review, and being home on install day. We handle the other ~95% — that's the point of choosing a full-service installer.
Start step one right now
The instant estimate takes about 60 seconds and doesn't require a phone call.
Get My Instant Estimate